Our main service

Efficient green cover, tailored to your ground.

Hydroseeding combines seed, mulch and supporting materials in a sprayed application designed around the site, intended use and result you want to achieve.

A practical answer for opened ground

When excavation, construction or land preparation leaves bare soil, establishing cover helps improve presentation and manage issues such as dust and erosion. Hydroseeding is suited to everything from residential lawns to larger commercial landscaping and revegetation areas.

Residential lawns

A cost-conscious way to establish a lawn across prepared areas.

Commercial sites

Efficient application for developers, builders, landscapers and managed properties.

Erosion control

Seed and mulch options for sloped, disturbed or exposed ground.

Revegetation

Seed blends selected around the use, conditions and project requirements.

What we assess

Every job is quoted individually. We consider the area, ground condition, slope, site access, spraying distance, water availability, preparation, specified seed or mulch requirements, labour and materials.

Ground preparation matters

Hydroseeding performs best on properly prepared soil. The area generally needs to be cleared of weeds and debris, shaped to the required levels, loosened rather than heavily compacted, and ready to receive seed. Drainage, topsoil condition and irrigation should be addressed before application.

Read the ground preparation guide →

Aftercare is part of the result

Consistent watering during the first 4–6 weeks is important. Your exact schedule will depend on the seed blend, weather and soil. We provide project-specific guidance so you understand what is needed after application.

Good to know: Germination and establishment depend on preparation, watering, weather, soil and ongoing care. We’ll explain the factors relevant to your site, but natural growth cannot be guaranteed.

Common hydroseeding questions

How long does it take to establish?

Germination and establishment timing varies by seed, soil, weather and watering. Some seed may emerge within days while other species take longer; developing useful, resilient cover takes weeks rather than one fixed number of days.

Will hydroseeding work on a slope?

Hydroseeding can be suitable for sloping ground, but slope ratio, runoff, soil, access and the required erosion-control performance need to be assessed. Steeper or higher-risk sites may need a specific mulch, treatment or engineered specification.

What preparation is needed?

Most sites need weeds and debris removed, finished levels and drainage completed, suitable topsoil, and a lightly loosened final surface. We confirm requirements for your site before work starts.

How much watering is required?

Newly applied seed generally needs frequent, gentle watering to keep the surface moist without causing runoff. The first 4–6 weeks are important, and your project instructions should always take priority over general guidance.

Ready when you are

Ready to move from dirt to green?

Complete our service-specific questionnaire and we’ll come back to you with the right next step.